How to price a job as a tradesman: your rate, materials and the unknowns

Work out what an hour really costs you, choose hourly, day rate or fixed price, mark up materials, and check after the job that the price made you money.

Alexis ClarembeauFounder of ACL Software, the company behind Hexvan

8 min read

To price a job, start from what an hour of your time really costs: your wage, the van and every other cost of the business, divided by the hours you can actually bill, which is usually 60–75% of the hours you work. Then add materials at cost plus a markup, and price whatever you can’t see yet as separate lines, not a padded total.

Most tradespeople don’t lose money on the work. They lose it on the hour spent quoting, the merchant runs and the week off with flu, which nobody pays for unless your rate does. Here is how to build a price that covers all of it.

How much should I charge per hour as a plumber or electrician?

Your rate has to pay for three things: your wage, the costs of the business, and a profit for the bad months. And it can only be charged on the hours you bill.

The hours you bill. A working week is not 40 billable hours. Take off:

  • travel between jobs, and the merchant runs;
  • quoting: site visits, measuring up, writing the quote, chasing the answer;
  • admin: invoices, receipts, phone calls, the accounts;
  • holidays: in the UK, employees get at least 5.6 weeks of paid leave a year, which can include bank holidays (GOV.UK). Self-employed, your rate pays for yours;
  • sick days, and the days a job falls through.

The costs. The van (lease, fuel, insurance, servicing), public liability insurance, tools, workwear, your phone, software, the accountant, scheme fees, advertising. Go through last year’s bank statements: they are all in there.

Tax. Aim for a wage before tax, and put a share of every payment aside the day it lands. In the UK, the self-employed pay Income Tax and Class 4 National Insurance on their profit (GOV.UK).

A worked example

A plumber wants a wage of £35,000 before tax. The business costs £12,000 a year. Add 10% profit: (£35,000 + £12,000) × 1.10 = £51,700 to bring in.

Hours: 52 weeks, minus 7 off (holidays, bank holidays, a week of sickness) = 45 weeks × 5 days × 8 hours = 1,800 hours worked. Billing 70% of them: 1,260 hours.

£51,700 ÷ 1,260 = £41 an hour, or £328 for an 8-hour day, before VAT.

Divide the same £35,000 by 52 weeks of 40 hours and you’d get £17 an hour. That gap is how tradespeople go broke while being busy. Try your own numbers in the hourly rate calculator.

Day rate vs fixed price: which should I use?

Each has its place. The trick is matching it to how much of the job you can see.

Way of pricing Fits The risk sits with
Hourly Small repairs, call-outs, fault-finding, “while you’re here” jobs The customer
Day rate Work for builders and other trades, jobs where the scope keeps changing The customer
Fixed price Jobs you can see and measure: a boiler swap, a rewire, a re-roof You
Fixed + extras Fixed price for what you can see, priced lines for what you can’t Shared, in writing

Homeowners prefer a fixed price. In the UK, Citizens Advice tells them a quote should have “a fixed total price - not a daily rate” (Citizens Advice). So for domestic work, show your day rate inside a fixed price (“3 days at £328”), not instead of one.

How do I protect a fixed price against the unknowns?

A fixed price is a promise: once the customer has accepted it, you can’t charge more for the same job, only for extras they ask for or agree to pay (Citizens Advice). So write the unknowns into the quote, before you start, and agree any extra in writing before you do it:

  • Exclusions. “Excludes decorating, and making good beyond filling and sanding.”
  • Provisional sums. For something you know is coming but can’t size yet: “Provisional sum for replacing rotten joists: £85 per joist, charged only if needed.”
  • “If we find…” lines. “Price assumes the existing pipework is sound. If it isn’t, the extra work will be priced and agreed before it starts.”
  • Assumptions about access. Parking, scaffolding, working hours, who clears the room.

Don’t pad the total “just in case”. You’ll lose the jobs where nothing goes wrong.

How much markup should I put on materials?

First, know whether you mean markup or margin. They’re the same profit, measured against different numbers:

  • Markup is the profit as a share of the cost.
  • Margin is the profit as a share of the price.

Materials cost you £1,400 at trade. A 20% markup gives £1,400 × 1.20 = £1,680. The profit is £280, which is 16.7% of £1,680: a 20% markup is a 16.7% margin. If you wanted a 20% margin, the price is £1,400 ÷ 0.80 = £1,750. The markup calculator does both ways round.

Why mark up at all? You choose the parts, collect them, carry the cost until you’re paid, and deal with the wrong valve going back to the counter.

Your trade discount is yours. Open a trade account at the merchant’s you use most, and ask again each year what your spend earns. Your trade price plus markup is often still close to what the customer would pay at retail.

Who buys the materials has to be clear on the quote. If the customer wants to supply their own:

  • price your labour without the markup you would have made, but charge for the time it costs you (checking, waiting, wrong parts);
  • write it down: “Customer-supplied materials: fitting only. Delays or returns caused by customer-supplied parts are charged at £41 an hour.”

Should I have a minimum charge or a call-out fee?

Yes. A 20-minute tap washer still costs you the drive there, parking, the drive back and a gap in your day. A minimum charge covers it: for example, “Minimum charge £60, including the first hour on site, then £41 an hour.”

Say it before you go, on the phone or in the text confirming the visit. A call-out fee the customer hears about at the door is a row; one they agreed to is just the price. Out-of-hours and emergency rates work the same way: higher, and said upfront.

Should I charge for quotes?

For most jobs, no: a visit to price a boiler swap is part of winning work, and your rate already allows for it. But customers are told that “some traders charge for quotes” (Citizens Advice, above), so it is normal for surveys and designs: a rewire layout, a roof survey with a report.

The fair way: “Survey £150, deducted from the job if you go ahead.” Serious customers don’t mind.

Did the job make money?

Check it, at least on the bigger jobs. Back to the plumber, fitting a bathroom suite:

On the quote Price What really happened Cost
Labour, 3 days at £328 £984 It took 4 days
Materials (£1,400 + 20%) £1,680 Materials came to £1,450
Skip £280 Skip £280
Total, before VAT £2,944 £1,730

£2,944 − £1,730 = £1,214 left for 4 days of work: £303.50 a day, against the £328 you need. Ask why. A morning lost waiting on a part? Price that kind of job at 4 days next time. Do this on five jobs and you’ll know which work pays and which you are subsidising.

When and how should I put my prices up?

When your costs go up, when you’re booked solid weeks ahead, and at least once a year. New customers just get the new price. Quotes already out keep theirs until their “valid until” date. Regular customers (landlords, letting agents, the builder you work for) get a month’s notice:

From 1 February, my hourly rate goes up from £41 to £44 and my minimum charge to £65. Quotes already sent keep their price until their valid-until date. Thanks for the work, as always.

No apology, no essay on fuel prices. Most will reply “fair enough”.

The classic pricing mistakes

  1. Pricing to the competition. You don’t know their costs, their hours or whether they’re still trading next year. Price from your own numbers.
  2. Forgetting travel. The drive, parking, congestion charges and the extra trip back for a forgotten part.
  3. Firm prices on the phone. Give a range at most, and a written price after a visit.
  4. Forgetting waste. Skips, tip fees and the old boiler have a cost.
  5. Rounding down to win the job. If the price only works when nothing goes wrong, it doesn’t work.

Before you send the next quote

  1. Know your hourly rate and day rate, from your own costs and billable hours.
  2. Pick the way of pricing that fits how much of the job you can see.
  3. Add materials at trade price plus your markup, and say who supplies them.
  4. Write the exclusions, provisional sums and “if we find…” lines.
  5. Put your minimum charge and validity date on it.
  6. After the job, compare the price with the real hours and costs.

How Hexvan helps

Keep a catalog of your services and products at your usual price in Hexvan (your hourly rate, day rate, minimum charge, the parts you fit most) and fill quote and invoice lines from it in a tap. Keep pictures of what you are pricing with the quote. Quotes are valid 30 days unless you say otherwise, the customer signs with a finger on your phone or online from a private link, and one tap turns the accepted quote into the invoice. What you pay at the merchant’s goes in as a receipt, with a photo of the paper one, so the real costs are to hand when you check a job. £15 a month, excl. VAT. The whole team. No contract.

The short version

Work out what an hour really costs you, spread over the hours you can bill. Charge by the hour for small jobs and a fixed price for jobs you can see, with the unknowns as their own lines. Know your markup from your margin, set a minimum charge, check the bigger jobs afterwards, and put your prices up once a year, with notice.


This is general information, not tax or legal advice. The UK rules mentioned are correct on 15 November 2026, from GOV.UK and Citizens Advice; they differ elsewhere. For your own situation, ask an accountant.